CenterPoint Energy

Beltline Replacement

Pipeline Replacement Design

CenterPoint Energy’s rehabilitation and upgrade of approximately 61 miles of the 20- and 24-inch diameter steel pipe Metro Belt Line System is a multi-year project to enhance pipeline safety, reliability, and capability, as well as better facilitate ongoing maintenance and inspection of the pipeline. The majority of the project scope included pipeline design and installation in predominately urban/suburban locations spanning 12 cities and required close coordination with the variety of agencies involved to deliver a successful design.

Project Type Pipeline
Location Twin Cities Metro Area, MN
Completion Date 2022
Market Oil & Gas

Need help with a challenging infrastructure project? Let's talk.